
Factory strength
Manufacturing Capability
Frames, upholstery, assembly and export packing in one workshop in Foshan, Guangdong — reviewed by our own quality team before shipment.
Workshop photography and video are placeholders — replace with your own footage
Production floor
Four stages, one order file

Stage 01
Frame production
Timber is cut, drilled and assembled; steel bases are cut, welded and powder coated in the same workshop.

Stage 02
Upholstery
Fabric and leather are cut to pattern, sewn and hand-stretched over foam, with seams checked against the approved sample.

Stage 03
Assembly
Frames, shells and glides are fitted and squared up before the model moves to the finishing line.

Stage 04
Packing & loading
Cartons are labelled per model and phase, then stacked and photographed before the container is sealed.
Customization
What can be changed on a model
Customization is quoted per model and per project. Changes that affect the frame or structure are drawn and sampled before bulk production.
Discuss a Hospitality ProjectDimensions
Seat height, width and depth adapted to project drawings.
Upholstery
COM / COL accepted, with grading and durability guidance.
Frame finish
Wood stain, powder coating, brushing and plating options.
Branding
Labels, foot glides and packaging marked to your brand.
Packing
Export carton, pallet and knock-down options per project.
Export experience
Working with overseas project teams
We ship to buyers and fit-out contractors across four regions, with export cartons, pallet plans and loading photos prepared per shipment. Commercial documents follow the terms agreed in the quotation.
- North America
- Europe
- Middle East
- Australia & New Zealand
Project references
Reference projects, client names and shipment volumes are shared on request once a project brief is received.
Realistic lead times
Lead times we plan around
Timings below run from confirmed drawing and material approval. Fabric selection, finish approval and inspection points are the usual variables.
Sample
12–18 days
From confirmed drawing and material selection.
Standard models
35–45 days
After sample approval, on confirmed order quantity.
Custom project orders
45–60 days
Depends on finish approval, fabric lead time and inspection points.
Quality control
Four inspection points
01
Incoming inspection
Timber, foam, fabric and hardware checked against approved standard.
02
In-process checks
Frame joints, filling density and seam alignment verified on the line.
03
Finished goods sampling
Dimensional and stability checks on each production batch.
04
Pre-shipment inspection
Full carton review, labelling and loading photos before departure.

A walk-through of the workshop, from frame benches to the packing area. Video is uploaded once filming is complete.
Footage to be suppliedVisit the workshop or send a drawing
Factory visits are arranged with the export team. For remote projects, a drawing and reference image are enough to start sampling.